Customs Street Residential Diaphragm Walls

CLIENT

March Construction

​

PROJECT COMMENCEMENT

Sept 2017

​

PROJECT COMPLETION

Feb 2018

The Customs Street Residential diaphragm walls (D-walls) project which commenced in mid-September
2017 and concluded in late February 2018 involved the manufacture of 26 prefabricated D-wall cages.


The longest D-wall measured 19 metres in length with a width of 5.7 metres, and the total combined
weight of the D-walls measured 700 tonnes.

 

This project had 20 Steel fixers working at any single time with two to three steel fixers on site. Capping beams which will be fitted on top of the diaphragm walls will be supplied by mid-April.

CustomsSt1 (6)
CustomsSt1 (5)
CustomsSt1 (4)
CustomsSt1 (2)
CustomsSt1 (3)
CustomsSt1 (1)
Mates in Construction
Toitu_carbonreduce
  • LinkedIn

© 2020 by Complete Reinforcing Ltd

Euro Corp ILAC-MRA
sitesafe_member.png
rgb-concretenz_master_logos_.png
Euro-Corp transparent logo.png
bottom of page